Controlled from tender to handover.

A defined delivery lifecycle, daily site reporting, a live company dashboard and an integrated quality, health, safety and environmental management system certified to three ISO standards.

Delivery lifecycle

Six stages, every project.

Every project is baselined from its tender: the estimate, programme and procurement plan become the project's controls.

01

Tender

  • Scope review against drawings and specifications
  • Quantity take-off and priced estimate
  • Tender programme and manpower histogram
  • Value-engineering options
02

Engineering

  • Shop and coordination drawings
  • Load, head and ESP calculations
  • Material submittals and samples
  • Authority design approvals
03

Procurement

  • Approved makes and vendor list
  • Long-lead equipment ordered first
  • No order without approved submittal
  • Delivery tracked to programme
04

Construction

  • Own trades plus specialist subcontractors
  • Area-by-area work sequence
  • WIR and MIR inspection regime
  • Daily site and manpower reports
05

Commissioning

  • Pressure and insulation tests before concealment
  • System commissioning and balancing
  • Integrated systems testing
  • Authority inspections
06

Handover

  • As-built drawings
  • O&M manuals and spare parts
  • Client staff training
  • Defects liability support
Project controls

Every project on one page.

Cost, progress, manpower and cash are reported from site data, not estimates. Clients and consultants receive a monthly progress report with the submittal, RFI and inspection logs.

01

Company dashboard

Every live project on one portfolio view: programme, progress, submittals, inspections, safety and a status rating, refreshed from the project registers.

02

Daily manpower return

A standard end-of-day report from every site: trades, headcount and area of work, split into in-house manpower and subcontractors.

03

Histograms and productivity

Actual manpower histograms for the company and each project, compared with the tender histogram to measure productivity and plan resources.

04

Procurement tracking

Every long-lead item tracked from approved submittal to order, factory test and delivery against the required-on-site date.

05

Monthly project audit

A review, independent of the project team, of each project's contract, programme, cost, billing and document control, with findings tracked to close-out.

06

Look-ahead planning

Rolling three-week look-ahead programmes agreed with the main contractor, linking area handovers, inspections and deliveries.

QHSE policy

We hold ourselves accountable for quality, health, safety and the environment – to our clients, our people and the communities we build in.

Quality

  • Inspection and test plan for every system
  • Material inspection on delivery (MIR)
  • Work inspection before concealment (WIR)
  • Tests witnessed by the consultant
  • Non-conformance and corrective action records

Health & safety

  • Site induction and daily toolbox talks
  • Permit to work for hot work, energised systems and work at height
  • PPE and HSE rules applied on every site
  • Incident reporting and investigation

Environment

  • Waste segregation and removal from site
  • Spill control for oils, refrigerants and chemicals
  • Energy-efficient equipment (Green Building regulations)
  • Refrigerant recovery during replacement works
  • ISO 14001 objectives and targets

Authorities we design, install and test to

DEWA
SEWA
ADDC
Etihad WE (formerly FEWA)
Dubai Civil Defence
Sharjah Civil Defence
Abu Dhabi Civil Defence
Dubai Municipality Green Building
Trakhees
Dubai Silicon Oasis Authority
Command of Military Works
Empower / Tabreed
e& (Etisalat)
Sharjah Municipality (LPG)
Testing, commissioning & handover

Every system proven before handover.

Tested before concealment, commissioned with the manufacturers, balanced to design flows, inspected by the authorities and handed over with complete records.

Fire pump set ready for Civil Defence inspection
StageActivities
Commissioning planIssued at 60% progress: systems, sequence, specialists, power and water availability, witnessing and authority inspections.
Tests before concealmentDuct leakage; hydrostatic tests on CHW, water and fire piping; drainage tests; refrigerant pressure and vacuum; insulation resistance; earth resistance.
Pre-commissioningCleaning, flushing and chemical treatment of CHW; equipment checks; protection settings; energisation after authority connection.
Commissioning and balancingStart-up of chillers, AHUs, pumps, VRF, generators, fire pumps and BMS with the manufacturers; air and water balancing to design flows.
Authority inspectionsDEWA, SEWA, ADDC, Etihad WE, Civil Defence, district-cooling provider, telecom and municipality inspections and completion certificates.
Integrated systems testingFire alarm interfaces with smoke control, HVAC shutdown, lifts, access control and BMS, tested with the main contractor.
Supply chain

No single point of failure.

At least two approved sources for every critical category, UAE factories preferred for shorter lead times and in-country value, and long-lead equipment ordered first and tracked weekly.

CategoryManufacturers and key suppliers used on company projects
HVAC equipmentDaikin, Carrier, LG Multi V, VTS air handling, Leminar, SKM; ETS by District Cooling International
Ductwork, dampers and insulationExplorer Duct factory, Delta Duct, Techno Pro, Betec dampers, Hira Industries, Astic and Beta Industrial insulation
LV switchgear and busbarAl Jalal, Al Qudrah, Evershine, Glitter and Power Energy switchgear; Al Ittihad; Al Sanaya busway
Cables and wiring devicesNCI, Riyadh Cables, Elsewedy, Ducab and Oman Cables
Pumps, plumbing and drainageGrundfos, Wilo, Polyfab, Gulf Plastic, SEAQ GRP tanks
Fire, BMS, ELV and powerNAFFCO fire and smoke systems; Honeywell BMS; Wotek BMS; Scientechnic; Epsilon WAV (ELV); Genyard and Casablanca generators
Management system & digital delivery

Documented, measured, improved.

An integrated management system manual, four policies, fifteen operating procedures and project templates, applied through each project's Project Quality Plan and Project HSE Plan.

P6

Primavera programmes

Level 4–5 programmes with resource loading and three-week look-aheads.

BIM

MEP models

LOD 300–400 models and clash-checked coordination drawings.

CAD

AutoCAD MEP & Revit

Shop drawings in AutoCAD MEP and Revit.

Live

Company dashboard

Cost, progress, manpower and procurement refreshed daily from site registers.