Efficient buildings. Responsible sites.

Building services use most of the energy and water a building consumes in its life. Engineering them well – and building them responsibly – is the biggest contribution an MEP contractor can make.

Environmental policy

We engineer building services that use less energy and less water, and we build them with less waste – on every project, to ISO 14001.

6projects
Designed for or connected to district cooling, including Empower networks
7projects
With heat-recovery fresh-air units
4projects
With lighting control systems
50%
Target share of site waste diverted from landfill
ZeroR22
No ozone-depleting R22 in the new systems we install
14001ISO
Environmental management certified to October 2029

Project counts are taken from our project records (district cooling: Sky Hills Residences 3, The Pier, Palm Jumeirah hotel apartments, VIVA Distribution Centre, Silver Tower and Bluewaters). Targets are set in our environmental management procedure.

What we build

Systems that cut a building's footprint for decades.

Most of a building's lifetime emissions come from operating it. These are the systems we install that reduce them.

01

District cooling connections

Building chilled-water systems connected to district cooling plants through heat exchangers and energy transfer stations – far more efficient than building-by-building chillers.

02

High-efficiency plant

Chillers, pumps and fans with variable-speed drives, selected and balanced so that plant runs at its best efficiency at part load – plus solar water heating where it is specified.

03

Heat recovery

Fresh-air handling units with heat-recovery wheels that pre-cool incoming air with the building's exhaust air.

04

Controls and metering

Building management systems, BTU and energy metering, and lighting controls – so owners can see and manage what their buildings use.

05

Green building codes

Systems installed to the Dubai Green Building Regulations and Al Sa'fat, and to Estidama requirements in Abu Dhabi – including sub-metering and lighting-power limits on the five Al Ain clubs.

06

Lower-impact refrigerants

R410A and lower-GWP R32 in the DX and VRF systems we install, and no R22 in any new system.

How we operate

A smaller footprint on every site.

Our ISO 14001:2015 environmental management system (certificate FQC/E/0458/AE, valid to October 2029) sets the controls every project applies.

01

Waste segregated on site

Construction waste sorted at source – metal, cardboard, timber and general waste – and removed by licensed waste contractors.

02

Refrigerants contained

Refrigerant recovered during replacement works, systems pressure- and vacuum-tested before charging, and no venting to the atmosphere.

03

Spills prevented

Oils, chemicals and refrigerants stored on drip trays with spill kits at every store.

04

Less transport

UAE factories preferred for ductwork, switchgear, cables and tanks – shorter deliveries and in-country value.

05

Dust and noise controlled

Cutting and drilling with dust control, and noisy work scheduled to respect neighbours and occupied buildings.

06

Measured and reviewed

Environmental aspects, legal requirements and objectives reviewed every year under ISO 14001, and checked in internal and external audits.

Rooftop air-cooled chiller plant
Data centre efficiency

Efficiency is designed into the cooling chain.

In a data centre, cooling is the largest energy use after the IT load itself. We engineer for a low power usage effectiveness (PUE) from the basis of design.

  • Free cooling and high chilled-water temperatures to ASHRAE TC 9.9 envelopes
  • Hot- or cold-aisle containment to stop bypass air
  • Direct-to-chip liquid cooling for high-density AI racks
  • Variable-speed pumps and fans, with EPMS and BMS metering for PUE reporting
Data centre capability
Objectives

What we are working towards.

Our environmental objectives are set and reviewed each year under ISO 14001 and reported to management.

  • Oct 2026ISO 14001:2015 certificate re-issued, valid to October 2029
  • Nov 2026Environmental and sustainability procedure issued, with targets for every project