Everyone home safe, every day.
Safety is planned into every activity and owned by everyone on our projects – our own trades and our subcontractors alike.
Clear targets. Daily discipline.
Our health and safety procedure sets the targets every project works to, and the records every site must keep: a daily toolbox talk, a permit for every high-risk task and a monthly HSE report to management.
Man-hours are counted from company payroll for our own site staff and trades at eight hours a day; subcontractor hours are not included. Targets are set in our health, safety and welfare procedure. From 2027 we will publish our lost-time injury frequency rate from the monthly HSE register.
No activity is worth an injury.
Our procedure requires every task to start with a plan: a method statement and risk assessment approved before work begins, a permit where the work is high-risk, and a toolbox talk with the crew that will do it.
Every person on site has the authority to stop work they believe is unsafe, without blame. Our occupational health and safety management system is certified to ISO 45001:2018 (certificate FQC/OH/0459/AE, valid to October 2029) and applied on each project through a Project HSE Plan agreed with the main contractor and consultant.
On every site, our procedure requires:
- Site induction for every new worker and visitor
- Daily toolbox talks before the shift starts
- Permit to work for high-risk activities
- Every incident and near miss reported and investigated

Eight rules. No exceptions.
The activities that cause the most serious injuries in MEP work are controlled by rules that apply to everyone on our sites, every time.
Work at height
Certified scaffolds and mobile towers only, inspected and tagged; full-body harness clipped on above two metres where there is no edge protection.
Isolate and lock out
No work on electrical, pressurised or rotating systems until they are isolated, locked, tagged and proven dead.
Hot work permit
Welding, brazing and cutting only under a hot-work permit, with a fire watch and an extinguisher at the point of work.
Lifting operations
Every lift planned; certified lifting gear and slingers; nobody under a suspended load.
Confined spaces
Tanks, pits and plant rooms entered only under permit, with gas testing and a standby person outside.
Excavations and openings
Trenches shored or battered, and every shaft and slab opening covered or barricaded.
Heat stress
Water, shade and rest breaks every day; the midday break observed from 15 June to 15 September.
Stop work authority
Anyone may stop a task they believe is unsafe – and will be thanked for it.
Plan, train, control, check, learn.
Our ISO 45001 system turns the safety policy into daily practice on every project.
Plan
Method statements and risk assessments approved before work starts, and a Project HSE Plan agreed with the main contractor and consultant.
Train
Site induction for every worker and visitor, daily toolbox talks, and task training for scaffolds, lifting, hot work and electrical isolation.
Control
Permits to work for high-risk activities, PPE for every task, and our subcontractors held to the same rules as our own trades.
Check
Daily site inspections by supervisors, weekly HSE inspections, and internal and external audits of the ISO 45001 system.
Learn
Every incident and near miss must be reported and investigated, with the lessons shared across all our sites in the next toolbox talks.
Care
Accommodation, transport, drinking water, shaded rest areas and first aid, because welfare is part of safety.
Built for the UAE summer.
Heat is the hazard every UAE site shares. From 15 June to 15 September we observe the national midday work break, and our heat-stress controls run all year.
- Midday work break from 12:30 to 15:00, 15 June to 15 September
- Cool drinking water and shaded rest areas at every work front
- Heat-stress awareness in toolbox talks, with supervisors watching for symptoms
- Heavy and outdoor work scheduled for the cooler hours
- First-aid kits and trained first-aiders on every site


Safety is part of every tender we submit.
Our tender submissions include the Project HSE Plan, method statements and risk assessments for the works. Ask us for our HSE prequalification documents.