Finishing a building others had started.
A part-built tower pair.
Donna Twin Towers had stalled during construction. Our scope covered the new MEP works and the inspection, repair and, where needed, re-installation of services that had already been installed – to the standard the authorities would inspect at handover.
Survey, repair, complete.
We surveyed the existing installations, recorded what could be kept and repaired or replaced the rest before new work covered it, then completed the central plant, risers and apartment systems tower by tower.
Smoke management was engineered and tested to Dubai Civil Defence requirements, and the electrical distribution was completed over eleven LV panels with busbar risers and a standby generator.
Two towers completed.
Both towers were completed in 2023, with the systems tested and commissioned for handover to Dubai Silicon Oasis Authority, Civil Defence and DEWA.