Case study · Retail · Completed · 2019–2022

Nesto Shopping Centre

Full MEP for a 55,000 m² shopping centre in Sharjah, taken over mid-construction as the developer's nominated subcontractor: 1,400 TR of chillers, 6,200 kW of power, LPG and fire protection.

Nesto Shopping Centre
Nesto Shopping Centre – Al Nahda, Sharjah
Project overview

2B+G+M+3+R shopping centre of 55,000 m²: 1,400 TR chiller plant, smoke management to Sharjah Civil Defence, 6,200 kW electrical with generator, LPG, fire pumps and FM-200. Nominated MEP subcontractor, 2019.

Status
Completed
Sector
Retail
Location
Al Nahda, Sharjah
Employer
Ayedh Bin Dejem Group
Main contractor
Modern Building Contracting
Consultant
BHNS Engineering Consultancy
Building
2B+G+M+3+R shopping centre, 55,000 m²
Start on site
September 2019
Completion
2022
Our scope
Full MEP and LPG
1,400TR
Air-cooled chiller plant
6,200kW
Electrical load
55,000m²
Shopping centre area
Challenge, solution, outcome

Taking over a live shopping-centre project.

01 / The challenge

Step in, and keep the programme.

In September 2019 the developer nominated Asian Falcons to carry out all MEP works on a shopping centre already under construction, with instructions to start immediately.

A mall concentrates every system in one building: smoke management for large open volumes, a central LPG system for food outlets, high electrical loads and a fire strategy approved by Sharjah Civil Defence.

02 / Our solution

Mobilise in days, engineer for Sharjah.

We held the site kick-off four days after the nomination, re-planned the remaining MEP works with the main contractor and released long-lead plant first.

Smoke management was engineered to Sharjah Civil Defence, LPG to Sharjah Municipality and power to SEWA requirements, with phenolic, GI and fire-rated ductwork and pressure-independent control valves.

03 / The outcome

Completed in 2022.

All MEP systems – chiller plant, smoke management, power, LPG and fire protection – were completed in 2022, followed by twelve months of free maintenance under the subcontract.

Systems delivered

What we engineered and installed.

Every system below was engineered, supplied, installed, tested and commissioned by Asian Falcons or by approved specialists under our supervision.

HVAC

  • Air-cooled chiller plant, 1,400 TR
  • Fresh-air handling units
  • Phenolic, GI and fire-rated ductwork
  • Smoke management to Sharjah Civil Defence
  • Pressure-independent control valves

Electrical

  • 6,200 kW electrical load
  • Standby generator
  • Central-battery emergency lighting

Fire & LPG

  • Fire pump sets, sprinklers and hydrants
  • FM-200 clean-agent protection
  • Addressable fire alarm
  • Central LPG system to Sharjah Municipality

ELV

  • CCTV
  • Public address
Timeline

Key dates.

  • 25 Sep 2019Nominated by the client, through BHNS Engineering Consultancy, for all MEP works
  • 29 Sep 2019Site kick-off
  • 31 Oct 2019MEP subcontract signed with Modern Building Contracting
  • 2020–2021Plant procurement, installation and testing
  • 2022Completion, followed by twelve months' maintenance
Approvals and inspections

Inspected and approved at every stage.

  • Nominated MEP subcontractor through BHNS Engineering Consultancy, September 2019
  • Smoke management to Sharjah Civil Defence
  • Central LPG system to Sharjah Municipality requirements
  • Power to SEWA regulations