ISO 9001 · ISO 14001 · ISO 45001 certified  |  Licensed in Dubai, Sharjah and Abu Dhabi
Asian Falcons Engineering Contracting L.L.C. Tender enquiry
Home/Projects

Engineering proven on site.

Twelve projects in progress in Dubai, Sharjah and Abu Dhabi – from Khorfakkan to Al Ain – and more than sixty-five completed across the UAE and Iraq. A selection is shown below.

Case studies

How we delivered them.

The challenge, our solution and the outcome on eight flagship projects, with the systems we installed and photos from site.

Residential · In progress

Sky Hills Residences 3

MEP for a 42-storey residential tower and its 10-storey companion in Jumeirah Village Circle: about 500 apartments on district cooling, 773 fan-coil units and 4,700 kW of connected load.

Read the case study
Residential · In progress

Ajwan Residences

MEP, facade lighting and CCTV for six residential buildings on the Khorfakkan waterfront for Shurooq: 185 apartments and 11 shops over 63,900 m² – the largest contract in our history.

Read the case study
Visualisation
Transport & Infrastructure · In progress

Commercial & Robotic Car Park

Full MEP and ELV – engineered, supplied, installed and commissioned – for an RTA smart-parking project in Souq Al Kabeer: an automated car park with six robotic towers, 352 spaces and commercial areas.

Read the case study
Visualisation
Residential · Completed

Marsa Dubai Residential Tower

MEP for a 20-storey residential tower in Dubai Marina, from the rooftop chillers to the apartment thermostats – completed in April 2026 with no delays or penalties.

Read the case study
Residential · Completed

Donna Twin Towers

Completing two stalled 30-storey towers in Dubai Silicon Oasis: full MEP for almost 400 units, with 2,400 TR of chillers and 12,100 kW of connected load.

Read the case study
Retail · Completed

Nesto Shopping Centre

Full MEP for a 55,000 m² shopping centre in Sharjah, taken over mid-construction as the developer's nominated subcontractor: 1,400 TR of chillers, 6,200 kW of power, LPG and fire protection.

Read the case study
Retail · Completed

Wolfi's & Colnago Bike Showroom

MEP and back-of-house infrastructure for a showroom on Hudayriat Island, designed and built in 60 days: power approved by ADDC, 150 TR of VRV cooling and fire systems approved by Civil Defence.

Read the case study
Healthcare & Research · Completed

Communicable Diseases & Protein Engineering Laboratory

Design and build MEP for a 1,300 m² research laboratory floor in the Al Jalila Foundation building, delivered by the EPAC Technical Services JV Asian Falcons joint venture: HVAC with venturi valves and room pressure control, dehumidification, BMS, UPS-backed power, AV and IT, filtration and FM-200.

Read the case study
Ajwan ResidencesIn progress
Residential

Ajwan Residences

Khorfakkan, Sharjah
The company's largest award to date: MEP, facade lighting and CCTV works for six residential buildings with 185 apartments and 11 shops on the Khorfakkan waterfront, for Shurooq.
Sky Hills Residences 3In progress
Residential

Sky Hills Residences 3

Jumeirah Village Circle, Dubai
Our largest high-rise package to date: MEP for a 42-storey residential tower and a 10-storey companion tower over a four-level podium (LG+G+4P+42+R), with about 500 apartments – district cooling, 4,700 kW of connected load, home automation and temporary site services for the main contractor.
Development of Al Ain ClubsIn progressVisualisation
Government & Defence

Development of Al Ain Clubs

Al Ain, Abu Dhabi
MEP works for the development of five sports club facilities in Al Ain for the Abu Dhabi Sports Council.
The PierIn progressVisualisation
Residential

The Pier

Dubai Maritime City
HVAC and BMS for a G+4P+HC+23+R residential tower with 274 apartments in Dubai Maritime City, on Empower district cooling with 799 fan-coil units – our fourth tower for Continental Investments and Structure Advanced Building Contracting.
Boutique 23In progressVisualisation
Mixed Use & Commercial

Boutique 23

Al Jaddaf Waterfront, Dubai
HVAC, smoke management and ELV for a 4B+G+24+R mixed-use tower on the Al Jaddaf waterfront: three air-cooled screw chillers, two double-deck FAHUs with heat-recovery wheels and 490 fan-coil units.
Commercial & Robotic Car ParkIn progressVisualisation
Transport & Infrastructure

Commercial & Robotic Car Park

Souq Al Kabeer, Dubai
Full MEP for an RTA smart-parking project: an automated car park for 352 cars with six robotic parking towers over a basement, ground and six floors, with commercial areas and a built-up area of 17,500 m².
AYA ViewsIn progressVisualisation
Mixed Use & Commercial

AYA Views

Al Muraqqabat, Dubai
G+4P+M+7+R mixed-use building with 86 apartments and 6 shops: 1,500 kW electrical with generator and ATS, VRV and DX air conditioning, ELV and CCTV, plumbing, fire fighting and fire alarm.
La BoutiqueIn progressVisualisation
Residential

La Boutique

Al Jaddaf Waterfront, Dubai
4B+G+15+R residential building with 119 apartments: two air-cooled chillers, a fresh-air handling unit, about 320 fan-coil units, smoke management fans, CHW pumps, pressurisation and chemical dosing, with a full shop-drawing package.
Masaar MosqueIn progressVisualisation
Civic, Religious & Villa Communities

Masaar Mosque

Al Suyoh, Sharjah
HVAC for the Juma (Friday) mosque in Arada's Masaar community, Sharjah: VRF and package units with an energy-recovery ventilator, 147 TR in total.
In progress
Residential

Residential Building G+1P+6+R

Al Warsan 4, Dubai
Full MEP
In progress
Transport & Infrastructure

Fire & Irrigation Pumping Station

Dubai South
MEP for a B+G+R fire and irrigation pumping station: DX air conditioning, 482 kW electrical with a 350 kVA generator, and irrigation, booster and sump pumps, with fire systems approved by Dubai Civil Defence.
In progress
Industrial & Logistics

Wolfi Warehouse

KEZAD, Abu Dhabi
Fire fighting and fire alarm
Nesto Shopping CentreCompleted
Retail

Nesto Shopping Centre

Al Nahda, Sharjah
2B+G+M+3+R shopping centre of 55,000 m²: 1,400 TR chiller plant, smoke management to Sharjah Civil Defence, 6,200 kW electrical with generator, LPG, fire pumps and FM-200. Nominated MEP subcontractor, 2019.
Marsa Dubai Residential TowerCompletedVisualisation
Residential

Marsa Dubai Residential Tower

Marsa Dubai (Dubai Marina)
Full MEP for a 20-storey residential tower: air-cooled chillers and FAHUs, fire-rated ductwork and smoke management, busbar trunking, pumps and BMS.
Donna Twin TowersCompleted
Residential

Donna Twin Towers

Dubai Silicon Oasis
2B+G+3P+30 twin towers: eight air-cooled chillers, four FAHUs, ten CHW pumps, smoke management, 12,100 kW connected load over eleven LV panels, generator, ELV and plumbing.
VIVA Distribution CentreCompleted
Industrial & Logistics

VIVA Distribution Centre

Jebel Ali Free Zone
Distribution centre with a G+2 administration building: district cooling CHW, FAHUs, FCUs and industrial air coolers; switchgear, lighting control and generator; fire fighting, fire alarm and VESDA; BMS.
Silver TowerCompleted
Mixed Use & Commercial

Silver Tower

Business Bay, Dubai
2B+G+4P+27 commercial tower: about 16,000 m² (172,000 ft²) of ductwork, chilled-water systems and the district-cooling energy transfer station.
Wolfi's & Colnago Bike ShowroomCompleted
Retail

Wolfi's & Colnago Bike Showroom

Hudayriat Island, Abu Dhabi
MEP and back-of-house infrastructure for a G+1+R steel-structure showroom, designed and built by Asian Falcons in 60 days: 500 kW electrical supply approved by the Abu Dhabi Distribution Company, 150 TR VRV air conditioning, plumbing, ELV, fire fighting and fire alarm to Abu Dhabi Civil Defence, IT and back-of-house infrastructure (tanks, pumps, manholes and trenches).
MOE Smart Learning ProgrammeCompleted
Education

MOE Smart Learning Programme

Dubai, Sharjah, Ajman
Electrical, data and air-conditioning works in 800 classrooms and 220 IDF and MDF rooms, carried out in day and night shifts to meet the programme.
Shatra General Hospital (200 Beds)CompletedVisualisation
Healthcare & Research

Shatra General Hospital (200 Beds)

Thi Qar, Republic of Iraq
HVAC, drainage, water supply and fire-protection piping for a 200-bed general hospital, with shop drawings, ESP calculations, testing, commissioning and as-built documentation.
Completed
Healthcare & Research

Communicable Diseases & Protein Engineering Laboratory

Al Jalila Foundation, Dubai Healthcare City
Design and build of a research laboratory by the EPAC Technical Services JV Asian Falcons joint venture: HVAC with venturi air valves, room pressure control and dehumidification, BMS, electrical with UPS, low current, AV and IT, plumbing and filtration, fire fighting and FM-200. In October 2025 Al Amir Engineering Consultant issued a certificate recording the approval of the design and build MEP works.
The Edge – Ewan ResidencesCompleted
Residential

The Edge – Ewan Residences

Dubai Investments Park
HVAC, electrical, plumbing, gas
Jood ResidenceCompleted
Residential

Jood Residence

Al Qusais 1, Dubai
G+2P+12+R: DX air conditioning with FAHUs, phenolic, GI and fire-rated ductwork, smoke management to Dubai Civil Defence, testing and commissioning.
Amber Gem TowerCompletedVisualisation
Mixed Use & Commercial

Amber Gem Tower

Ajman
G+M+44+6P commercial tower: gas and fire systems and helipad lighting.
Al Shafar TowerCompleted
Residential

Al Shafar Tower

Business Bay, Dubai
B+G+M+2P+28: ductwork and accessories, risers, mechanical rooms, fire-fighting pipework, zone control valves, fire and jockey pumps and sprinklers.
Windsor Manor TowerCompleted
Residential

Windsor Manor Tower

Business Bay, Dubai
B+G+M+5P+25: insulated GI ductwork with volume control, VAV and fire dampers, and duct risers for all floors.
Bluewaters Building 0280 & TownhousesCompleted
Residential

Bluewaters Building 0280 & Townhouses

Bluewaters Island, Dubai
CHW (Empower), ductwork
The Legend – 500 VillasCompleted
Civic, Religious & Villa Communities

The Legend – 500 Villas

Dubailand
PIR ductwork with acoustic insulation, refrigerant piping and wiring, split ducted units, exhaust fans and air outlets for 500 villas.
International City – France ClusterCompleted
Residential

International City – France Cluster

Al Warsan, Dubai
Insulated GI ductwork, duct risers, and condensing and fan-coil units with refrigerant piping and wiring, for Nakheel.
The Villa Phase ICompletedVisualisation
Civic, Religious & Villa Communities

The Villa Phase I

Dubailand
HVAC (DX), ductwork
Euro Arabian Hospital – One-Day Surgery UnitCompleted
Healthcare & Research

Euro Arabian Hospital – One-Day Surgery Unit

Sharjah
Operating theatres and one-day-surgery unit delivered by Asian Falcons as main contractor: full MEP, BMS and nurse call.
MBRU Offices & Lecture HallsCompleted
Education

MBRU Offices & Lecture Halls

Dubai Healthcare City
MEP works for the university's offices and lecture halls on levels 2 and 3, delivered by Asian Falcons as the contractor.
Al Ghadeer CommunityCompletedVisualisation
Residential

Al Ghadeer Community

Seih Sdeirah, Abu Dhabi
Chilled-water HVAC works for the Sabil and Waha G+3 buildings in Sorouh's Al Ghadeer residential community on the Abu Dhabi–Dubai border.
Hotel Apartment 2B+G+6 (S94)CompletedVisualisation
Hospitality

Hotel Apartment 2B+G+6 (S94)

Al Barsha 1, Dubai
HVAC
Residential Building G+8Completed
Residential

Residential Building G+8

Polo, Dubai
MEP, HVAC (DX system)
Private Villas, Abu DhabiCompleted
Civic, Religious & Villa Communities

Private Villas, Abu Dhabi

Abu Dhabi
A B+G villa with health club and two G+1 villas: VRV air conditioning and a dehumidification system for the enclosed swimming pool.
Private Villa & Majlis, Al DhafraCompleted
Civic, Religious & Villa Communities

Private Villa & Majlis, Al Dhafra

Al Dhafra, Abu Dhabi
HVAC and plumbing
Sheikh Zayed Housing Programme VillasCompleted
Civic, Religious & Villa Communities

Sheikh Zayed Housing Programme Villas

Al Rahmaniya and Al Garayen, Sharjah
Government housing villas in Sharjah: pre-insulated ductwork, ducted split units, refrigerant piping, ventilation, electrical and plumbing works, tested and commissioned with a one-year warranty.
Al Adel School (KG1 to Grade 12)CompletedVisualisation
Education

Al Adel School (KG1 to Grade 12)

Al Ain
LG VRF system with fresh-air units, about 19,000 ft² of pre-insulated and 18,000 ft² of GI ductwork, and plumbing – completed within the summer break before the new academic year.
Al Ain Military CampCompleted
Government & Defence

Al Ain Military Camp

Al Ain
HVAC ductwork and risers
HBRCH Event TentCompleted
Healthcare & Research

HBRCH Event Tent

Al Jaddaf, Dubai
MEP
Completed
Hospitality

Hotel Apartments, Palm Jumeirah

Palm Jumeirah, Dubai
Nominated air-conditioning subcontractor (2018) for 2B+G+9 hotel apartments on district cooling.
Completed
Residential

Residential Building G+6P+HC+15+R

Al Nahda, Sharjah
Electrical (1,592 kW), HVAC
Completed
Civic, Religious & Villa Communities

Rashid Hospital Mosque

Umm Hurair 2, Dubai
MEP – maintenance and expansion
Completed
Mixed Use & Commercial

ELA Sales Pavilion

Palm Jumeirah, Dubai
MEP
Completed
Industrial & Logistics

LODD Offices & Warehouse 9

KEZAD, Abu Dhabi
Design & build MEP
Completed
Civic, Religious & Villa Communities

Mahatta Museum – New Hangar

Al Qasimiah, Sharjah
MEP
Completed
Industrial & Logistics

Rayan Logistics – Service Block & Offices

Dubai Investments Park
MEP for the service block and offices of a 10,000 m² cold-store facility
Completed
Hospitality

Courtyard by Marriott – Restaurant & Lobby

Al Barsha, Dubai
Mechanical works for the hotel's main restaurant and lobby.
Completed
Residential

Labour Accommodation

Hatta, Dubai
Air-conditioning works – approved subcontractor, 2018
Completed
Government & Defence

CMW Residential Buildings

Various locations, UAE
Air-conditioning replacement and electrical works

Scopes and figures are taken from contracts, nominations, approvals, project records and the company profile. Referee contact details and approval letters are provided with prequalification submissions on request.

Clients, contractors & consultants

Employers, contractors and consultants we work with

Employers and developers

Abu Dhabi Sports CouncilMinistry of EducationMinistry of Defence (CMW)Ministry of Health, IraqDubai Health AuthorityMusanadaShurooqSharjah Museums AuthorityDubai South PropertiesWahat Al Bastakiya (RTA)NakheelSorouhDubai PropertiesOmniyatAradaEDGE GroupLandmark GroupTameer HoldingLootah Real EstateContinental InvestmentsHRE Real Estate DevelopmentWolfi's & ColnagoTanmyatMBRUEuro Arabian HospitalHamdan Bin Rashid Cancer Hospital

Main contractors

Darwish Engineering EmiratesEmirates International ProjectsStructure Advanced Building ContractingHRE ConstructionModern Building ContractingCity Creek Building ContractingKTC International ContractingORC ContractingAYA ConstructionArena Middle East & AsiaRMB ContractingAl Serh Al Kabeer ConstructionAl Hazami Building ContractingDelta Al Emarate Building ConstructionsALCO Electro-MechanicalAl Arrab ElectromechanicalRobust ContractingOffset Building ContractingUnited Engineering & TradingProtechnique for Multi-ProjectsNaresco Contracting

Engineering consultants

Al Khawajah Engineering ConsultantsNational Engineering Bureau (NEB)Al Wasl Al Jadeed Consultants (AWAJ)Vision Engineering ConsultancyEnmaa Engineering ConsultantsSkyline Engineering ConsultantsBaynona Engineering (Abu Dhabi)ITEC InternationalArkiplan Consulting Architects & EngineersArchpix ConsultantsC V Tec Consulting EngineersAREC Engineering ConsultantsNext Engineering ConsultantsDEC Dynamic Design StudioStudio International EngineeringCanadian Engineering ConsultancyArabian Gulf Engineering Consultants (Abu Dhabi)Khatib & AlamiLacasa Architects & EngineeringAl Shandagha Architects & EngineeringArif & BintoakBHNS Engineering ConsultancyAl Burj Engineering ConsultantsAl Abbasy EngineeringMazaya EngineeringAl Amir EngineeringATI (Arab & Turk International)Shadid EngineeringUniqMiragePioneer EngineeringFederal EngineeringInternational Engineering ConsultantEmaret Al SharqEDCGAl Majal EngineeringDEC Design Construction Engineering
Work with us

Tendering an MEP or EPC package?

Send us your tender documents, drawings and BOQs. Our pre-construction team returns a priced offer with a tender programme and technical submission.